gateway
1
1
Howard Shanks7 Jan 2020
NEWS

Limited heavy vehicle access on Gateway Flyover Bridge continues

Important info for those operators driving heavy vehicles across the Gateway Flyover

The Department of Transport and Main Roads (TMR) remind heavy vehicle operators that structural inspection of the Gateway Motorway flyover at Gympie Arterial Road, Bald Hills is still ongoing and that heavy vehicle access restrictions that came into force on September 1, 2019 on the northbound lanes of the bridge is still in place.

Further weakening was identified, subsequently additional investigations on the northbound route are required.

Transport and Main Roads Regional Director for Metropolitan Region Patrick Dennehy said access changes were precautionary but necessary following structural investigations.

“These restrictions will ensure the ongoing safety for all road users,” Mr Dennehy said.

“The structure is safe, and this is just a precautionary measure until strengthening works can be completed.”

gateway

Mr Dennehy said restrictions would be imposed requiring most heavy vehicles to travel in the left-hand lane only.

“Some very heavy vehicles will be required to travel in the centre of the bridge under guidance,” he said.

“We ask other motorists to have patience and give these vehicles the space they need.

"The department will engage with heavy vehicle operators to facilitate the movement of these very heavy loads where possible.”

Signage, including variable speed and variable message signs, are installed to provide advice to operators and the travelling public regarding these changes.

More than 40,000 vehicles travel northbound along the Gateway Motorway and over this bridge each weekday, and the majority of these vehicles won’t be impacted.

The recently opened Gateway Upgrade North project has provided relief for motorists and the recently announced Australian and Queensland Governments' joint commitment of $1 billion for the upgrade between Bracken Ridge and Bruce Highway will allow this critical road upgrade work to continue.

“We apologise for any inconvenience caused and thank the community and industry for their patience while further works are undertaken,” he said.

Design of strengthening works is underway and is expected to be complete by mid-2020, and construction will start soon after.

For further information about the restrictions, visit www.tmr.qld.gov.au and search Gateway Motorway Flyover.

Tags

Share this article
Written byHoward Shanks
See all articles
Stay up to dateBecome a trucksales member and get the latest news, reviews and advice straight to your inbox.
Subscribe today
Disclaimer
Please see our Editorial Guidelines & Code of Ethics (including for more information about sponsored content and paid events). The information published on this website is of a general nature only and doesn’t consider your particular circumstances or needs.
© carsales.com.au Pty Ltd 1999-2026
In the spirit of reconciliation we acknowledge the Traditional Custodians of Country throughout Australia and their connections to land, sea and community. We pay our respect to their Elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.